Construction is moving at an amazing pace. All the pre-planning is paying off as we see our dream become reality with relatively few "change orders" and surprises. Recently the floors were laid out. Although the marks on the concrete are the same as the ones on the drawings, some of the rooms looked alot smaller to us once they were laid out.
Once the walls started to go up things sure looked different. The rooms regained their dimensions and looked "normal " again. These are the full height walls that separate the sections of the clinic for sound and ventilation control. Later the dropped ceiling height walls will go in.
No comments:
Post a Comment